How to calculate ship squat and under-keel clearance
A ship under way in shallow water sits deeper than she does at rest. The water has to get past the hull through the gap under the keel and around the sides, it speeds up to do so, its pressure falls, and the hull sinks bodily and changes trim. That sinkage is squat. At harbour-approach speeds it can take a metre or more off the clearance under the keel, and groundings in channels and river approaches are regularly traced to squat that was underestimated or not calculated at all.
Anyone who signs a passage plan across a bar, along a dredged channel or over a shoal needs two things: an estimate of squat at the planned speed, and a clearance budget that puts squat alongside the depth, the tide, the draft and the allowances for everything else. This guide works through both with the Barrass method, the one most widely taught to masters and pilots, and shows with numbers how much clearance a reduction in speed buys.
What squat is and why speed dominates
Squat is the reduction in under-keel clearance caused by the ship's own motion through the water. It is not an increase in displacement: the ship weighs the same, but the water surface around her is drawn down and she goes down with it, usually with a change of trim as well. The figure quoted is the maximum sinkage, at whichever end goes down further.
Three things drive it:
- Speed through the water. The pressure drop under the hull depends on the square of the flow speed, so squat rises roughly with speed squared. Barrass's fit to model and full-scale data gives an exponent of 2.08. Doubling the speed multiplies the squat by 22.08 = 4.2; halving it leaves less than a quarter.
- Blockage. The more of the waterway's cross-section the ship fills, the faster the water must flow past her. Blockage rises as the water gets shallower and as the channel gets narrower.
- Fullness of the hull. Squat is directly proportional to the block coefficient C_B. A full-bodied tanker squats more than a fine-lined ferry of the same size at the same speed.
The speed that matters is speed through the water, from the log, not speed over the ground from the GPS. With a following current the ship covers the ground faster than her squat speed; stemming a current, she can be squatting hard while barely moving past the buoys.
Open water, confined channels and the blockage factor
The blockage factor S is the ship's immersed cross-section, taken as breadth × draft, divided by the cross-section of the water she is moving in, width × depth:
S = B × T ÷ (W × h)
In a canal or dredged channel W is the channel width at the bed. In open water there are no banks, but the hull only disturbs the water within a certain distance either side. Barrass calls this the width of influence and gives it as a multiple F_B of the breadth:
F_B = 7.7 + 20 × (1 − C_B)²
W = F_B × B so in open water S = T ÷ (F_B × h)
For C_B = 0.80 the width of influence is 8.5 breadths; a finer ship disturbs a wider band. If a channel is wider than the width of influence, the banks are not adding to the squat and you treat the ship as being in open water. If it is narrower, the channel width governs and the squat is larger. The formulas treat the channel as rectangular; for a channel with sloping sides, use the width at about mid-draft.
The Barrass squat formulas
The ship squat and under-keel clearance calculator uses the general formula from C.B. Barrass, Ship Squat and Interaction, also set out in Barrass and Derrett, Ship Stability for Masters and Mates:
S_max = C_B × S^0.81 × V^2.08 ÷ 20 (metres, V in knots through the water)
Two simplified rules from the same source are shown beside it for comparison, both intended for depth-to-draft ratios h/T between 1.1 and 1.4:
Open water: S_max ≈ C_B × V² ÷ 100
Confined channel: S_max ≈ C_B × S^(2/3) × V^2.08 ÷ 20
The open-water rule is the one most officers carry in their heads. It is a fit for a typical h/T of about 1.2 and takes no account of the actual depth; the general formula does, through the blockage factor. Use the general formula for the plan and keep the rule of thumb as a sanity check. At h/T = 1.2 the two differ by about 8 %.
The calculator also reports the Froude depth number:
F_nh = V ÷ √(g × h) (V in m/s, g = 9.80665 m/s²)
√(g h) is the speed of a long wave in water of depth h, as the wave properties calculator shows for the shallow-water limit. As the ship approaches that critical speed, squat and resistance rise very steeply and the Barrass formula no longer holds. Stay below about 0.7.
Bow or stern: the role of the block coefficient
For a ship on an even keel at rest, where the maximum squat occurs depends on the hull form:
- C_B above 0.70 (tankers, bulk carriers): the ship trims by the head and the maximum squat is at the bow.
- C_B below 0.70 (container ships, ferries): she trims by the stern and the maximum is aft.
- C_B about 0.70: she sinks bodily with little change of trim.
The formula assumes even static trim. A ship that is already trimmed by the stern will usually increase that trim under way, and the method does not resolve trimmed ships separately.
Use the block coefficient at the draft you are actually sailing at. C_B falls as the ship rises, so the design-draft figure from the particulars overstates the squat in ballast. If the stability booklet does not tabulate it, the block coefficient calculator gives it from displacement, length, breadth and draft: a tanker of 228 m × 44 m at 12.2 m draft displacing 102,870 t in salt water has C_B = 0.82.
Building the under-keel clearance budget
Under-keel clearance is bookkeeping. Start with the water available, subtract what the ship needs, and compare what is left with the margin your company or the port requires.
| Item | Sign | Where it comes from |
|---|---|---|
| Charted depth | + | The chart, at the shallowest point of the leg, referred to chart datum |
| Height of tide | + | Tide tables for the time of transit, above the same datum |
| Static draft | − | Deepest draft at rest |
| Squat | − | Barrass general formula at the planned speed through the water |
| Other allowances | − | Heel, swell and wave response, water density, datum and sounding uncertainty |
| Net clearance | = | Compare with the required clearance |
h = charted depth + height of tide
UKC_static = h − T
UKC_net = h − T − S_max − allowances
UKC_req = (required % ÷ 100) × T
Margin = UKC_net − UKC_req
Depth and tide. The height of tide between high and low water comes from the tide tables; the tidal height calculator interpolates it by the rule of twelfths or the cosine curve and gives the time at which a required depth becomes available. Tide tables carry no weather: a deep depression or an onshore gale can raise the level by several decimetres, and high pressure lowers it.
Allowances. The calculator takes these as one figure that you enter, and it does not compute any of them. Think through each: a ship that heels in a turn or under wind puts her bilge lower than her keel was; swell makes the ends heave and pitch; passing from salt water into fresher water increases the draft; and neither the survey behind the chart nor the tidal prediction is exact. PIANC's channel design guidelines treat wave response as a separate component in exposed approaches. If you enter zero, the result is the best case and should be read as such.
Required clearance. This is policy, not physics, and the calculator never chooses it for you. Common figures are 10 % of the static draft in open water and sheltered approaches, 15 % in channels and 20 to 30 % in exposed approaches with swell. The port authority's figure or your safety management system governs.
Because squat is the only item in the budget that the bridge team controls minute by minute, the formula can be turned round to give the highest speed that still leaves the required margin:
V_max = [ 20 × (h − T − allowances − UKC_req) ÷ (C_B × S^0.81) ]^(1/2.08)
Worked example: a tanker at 12 knots and at 6 knots
A loaded tanker, C_B 0.82, breadth 44 m, static draft 12.2 m, crosses a shoal with a charted depth of 12.0 m in open water. The tide tables give low water 0.6 m at 03:00 and high water 4.2 m at 09:12; at 06:06, half-way through the rise, the height of tide is 2.4 m. The master allows 0.6 m for heel, swell and uncertainty, and company policy requires a net clearance of 10 % of draft.
- Depth: h = 12.0 + 2.4 = 14.4 m. h/T = 14.4 ÷ 12.2 = 1.18, inside the range the formula was derived for.
- Width of influence: F_B = 7.7 + 20 × 0.18² = 8.35, so W = 8.35 × 44 = 367 m.
- Blockage factor: S = 12.2 ÷ (8.35 × 14.4) = 0.1015, and S^0.81 = 0.157.
- Squat at 12 knots: 12^2.08 = 175.7, so S_max = 0.82 × 0.157 × 175.7 ÷ 20 = 1.13 m, at the bow. The rule of thumb gives 0.82 × 144 ÷ 100 = 1.18 m.
- Clearance at 12 knots: static 14.4 − 12.2 = 2.20 m; net 2.20 − 1.13 − 0.60 = 0.47 m. Required: 10 % of 12.2 = 1.22 m. The ship is 0.75 m short.
- Squat at 6 knots: 6^2.08 = 41.5, so S_max = 0.82 × 0.157 × 41.5 ÷ 20 = 0.27 m. Net clearance 2.20 − 0.27 − 0.60 = 1.33 m, which is 0.11 m more than required.
- Maximum speed: the squat the budget can afford is 2.20 − 0.60 − 1.22 = 0.38 m, so V_max = [20 × 0.38 ÷ (0.82 × 0.157)]^(1/2.08) = 7.1 knots.
| Speed through water | Squat | Net clearance | Against 1.22 m required |
|---|---|---|---|
| 12 kn | 1.13 m | 0.47 m | 0.75 m short |
| 10 kn | 0.77 m | 0.83 m | 0.39 m short |
| 8 kn | 0.49 m | 1.11 m | 0.11 m short |
| 6 kn | 0.27 m | 1.33 m | 0.11 m in hand |
Halving the speed from 12 to 6 knots cut the squat from 1.13 m to 0.27 m and bought 0.86 m of clearance. The Froude depth number falls from 0.52 to 0.26.
The other lever is the tide. If the master wants to keep 8 knots for steerage, he needs slightly more water. With 14.6 m of depth the squat at 8 knots is 0.48 m and the net clearance 1.32 m, 0.10 m in hand. That needs a height of tide of 2.6 m, which the rule of twelfths puts at 06:20: a wait of about a quarter of an hour.
Put the same ship in a dredged channel 250 m wide at the bed, narrower than her 367 m width of influence. The blockage factor becomes 44 × 12.2 ÷ (250 × 14.4) = 0.149, the squat at 12 knots rises to 1.54 m and the net clearance collapses to 0.06 m. The maximum speed for the required margin drops to 6.1 knots. Enter these figures in the ship squat calculator to reproduce every number above.
What else shallow water does to speed and handling
Squat is one symptom of a wider change. In shallow water the return flow is squeezed through a smaller section and the hull feels more friction, so the ship needs more power for the same speed, or loses speed at the same power. ISO 15016:2025 quantifies this for speed trials with Raven's method, in which the viscous resistance increase scales with (T/h)^1.79, and sets a minimum trial depth of the larger of 2.5 T and 2.4 V²/g. The shallow water correction calculator works an example of a bulk carrier of 11 m draft at 12 knots in 30 m of water: about 6 % of the delivered power is going into the shallow-water effect, at a depth nearly three times the draft. The ISO method is only valid above its minimum trial depth, so it gives no figure for the h/T of about 1.2 where squat matters, but the (T/h)^1.79 term shows the effect growing quickly as the water shoals. That is why a ship entering shoal water slows without anyone touching the telegraph.
On the bridge, the signs that the bottom is close are a drop in speed and engine revolutions, a change in the wave pattern alongside, more vibration and steering that turns sluggish. Near the critical speed the ship may become uncontrollable. In a narrow channel, bank suction and interaction with a passing or overtaking ship add sinkage and sheer of their own; neither is in the squat formula, so reduce speed and increase separation when meeting another vessel.
Two planning consequences follow. First, the reduced speed belongs in the passage plan, leg by leg: the passage plan calculator accepts a speed for each leg and shows what the slow-down does to the ETA and therefore to the height of tide you will actually have. Second, squat works in your favour under a bridge, since it lowers the ship, but the air draft calculator takes no credit for it unless you ask: relying on squat means relying on the margin that disappears when you slow down.
Common mistakes
- Using GPS speed. Squat depends on speed through the water. With a 2 knot current the error is 2 knots, which at these speeds is a large part of the squat.
- Using the design block coefficient at a lighter draft. C_B falls with draft; take it at the actual condition.
- Treating a dredged channel as open water. If the channel is narrower than F_B × B, the open-water figure is too low; in the example it understated the squat at 12 knots by 0.41 m.
- Mixing datums. Charted depth and height of tide must be referred to the same chart datum, and heights from a secondary port need their corrections applied first.
- Using the mean draft. The static draft in the budget is the deepest draft at rest.
- Leaving the allowances at zero. Squat is not the only thing that eats clearance. A budget with no figure for heel, swell and survey uncertainty is a best case.
- Applying the tide for the planned time, then arriving late. On a falling tide every minute costs depth. Recalculate when the ETA slips.
- Trusting the formula outside its range. See below.
Limits of the method
The Barrass formulas are empirical, fitted to model and full-scale data for h/T between 1.1 and 1.4. In deeper water they are an extrapolation and tend to overestimate; in shallower water the ship is nearly aground and no formula should be relied on. They are not valid near the critical speed, and the calculator warns above a Froude depth number of 0.7. A blockage factor above 0.3 is at the edge of the data, and bank effects become significant there.
The method assumes a rectangular channel, even static trim and a ship alone in the waterway. Wave-induced motions are not calculated. For the design of channels and for port clearance rules, PIANC's Approach Channels: A Guide for Design and Report 121, Harbour Approach Channels Design Guidelines, set out squat methods and the components of under-keel clearance; on board, the port's requirements and the company's safety management system decide the margin, and the pilot's local knowledge of how the ship in front actually behaved is worth more than the last decimal of any formula.
Questions that come up
Why do the general formula and C_B V²/100 give different answers?
The rule of thumb is fixed at a typical depth-to-draft ratio. The general formula follows the actual depth through the blockage factor, so it gives less squat in deeper water and more in very shallow water.
Does squat stop when the engine is stopped?
Squat follows speed through the water, not engine revolutions. It decays as the ship loses way, with the same near-square law that built it up.
Can I use the result to set a tidal window?
Yes. Fix the speed, find the depth at which the margin is just met, subtract the charted depth to get the height of tide needed, and read the times from the tidal curve on the rising and the falling side.
Calculators used in this guide
- MaritimeShip squat and under-keel clearanceBarrass squat in open water and confined channels, Froude depth number, net under-keel clearance against a required margin and the maximum safe speed.
- MaritimeTidal height (rule of twelfths)Height of tide and depth at any time between high and low water by the rule of twelfths or the cosine curve, and the time a required depth becomes available.
- MaritimeBlock coefficient and hull form coefficientsBlock, midship, prismatic and waterplane coefficients of a hull from its dimensions, and the displacement Δ = C_B L B T ρ in salt or fresh water.
- MaritimeShallow water correction (Raven / Lackenby)ISO 15016:2025 Annex G (Raven) shallow-water power correction — viscous increase and sinkage — plus the legacy Lackenby speed correction.
- MaritimeWave properties and encounter periodLinear wave theory: wavelength, celerity, group velocity, deep/shallow regime, orbital velocities and the encounter period for a ship speed and heading.
- MaritimeAir draft and bridge clearanceClearance under a bridge or power cable from the charted clearance, tide, the ship's air draft at its actual draft and trim, and the allowances.
- MaritimePassage plan from waypointsLeg courses, distances, times and ETAs from a pasted waypoint list, by rhumb line or great circle, with the passage totals.
Results are estimates. They do not replace the governing code, class or flag requirements, or a check by a competent person. Report an error in this guide
More guides
- Cargo securing calculation to CSS Code Annex 13
- How to do a draft survey calculation, step by step
- How EU ETS and FuelEU Maritime costs are calculated
- How to calculate a ship's CII rating, step by step
- Hull and propeller performance in service with ISO 19030
- Ship resistance and powering: from hull to installed power