Results are estimates. They do not replace the governing code, class or flag requirements, or a check by a competent person. Report a problem
Introduction
Molten plastic presses the two halves of a mould apart. The clamp of the moulding machine must hold them shut, or the part flashes at the parting line. The force needed is the projected area of the parts and runner times a clamp factor, the mean pressure in the cavity. Eight parts of 21.16 in² each at 3 tons per square inch need 507.8 US tons of clamp.
This calculator gives the total projected area, the clamp force and the smallest machine rating that keeps the clamp below a chosen share of its limit. It offers starting clamp factors from RJG and from polycarbonate processing guides, or takes your own cavity pressure. It is for mould designers, process engineers and buyers choosing a press.
n — number of cavities; A_cavity — projected area of one part; A_runner — projected area of a cold runner
p — clamp factor, the mean cavity pressure over the projected area
u — highest share of the machine rating to use, 80 % by default
Assumptions and limitations
The projected area is what you see looking along the direction the mould opens. Through-holes and cored-out areas are taken away. A hot runner adds no area.
Clamp factors depend on the resin, the wall thickness and the flow length. RJG gives 2 to 10 tons/in² with 3 as a starting point. The Lexan guide gives 3 to 5 tons/in² for polycarbonate and about 1 ton/in² more for glass-filled grades.
The best factor comes from the resin datasheet or from a cavity pressure measurement on the mould.
The machine should run below its rating. Autodesk Moldflow advises keeping the peak clamp force under about 80 % of the machine limit.
More clamp is not better. Excess force can damage the mould: RJG reports a cavity block that failed when clamped at four times the needed tonnage.
Worked example
This is RJG's example. A part measures 4.6 × 4.6 in in the direction of opening, and the mould has 8 cavities. As in the example, no runner area is added. Use 3 tons/in² as the starting clamp factor.
Area of one part: 4.6 × 4.6 = 21.16 in².
Total projected area: 8 × 21.16 = 169.28 in².
Clamp force: 169.28 × 3 = 507.8 US tons, or 4 518 kN.
At the 2 to 3 tons/in² that RJG expects for this part, the clamp needs 339 to 508 tons.
FAQ
How do I calculate clamp tonnage?
Multiply the total projected area in square inches by the clamp factor in tons per square inch. Include every cavity and a cold runner.
What clamp factor should I use?
The resin supplier's value for the grade. Without one, RJG suggests 3 tons/in² as a starting point. Polycarbonate guides give 3 to 5 tons/in².
What is projected area?
The shadow of the part on the parting plane, seen along the direction of mould opening. Side walls parallel to the opening add nothing.
Why should the machine not run at its full rating?
Autodesk Moldflow advises keeping the peak below about 80 % of the limit. The other 20 % is a reserve for pressure peaks, sliding cores and other loads from the tool.
What happens if the clamp force is too low?
The mould opens slightly under injection pressure and plastic flashes at the parting line.
How do I convert tons per square inch to MPa?
Multiply by 13.79. 3 tons/in² is 41.4 MPa, the same as 6 000 psi.
Before every release the calculator must reproduce each case below. The note under each case says where the expected answer comes from: a standard, a textbook, a published table, or a hand calculation shown in full.
RJG: 21.16 in² × 8 cavities = 169.28 in² × 3 tons/in² = 507.84 tons; the 2–3 tons/in² range gives 339 to 508 tonsRJG Inc., Clamp Tonnage: More is Better, Right? (worked example)
Units: 3 US tons/in² = 6 000 psi = 41.37 MPa = 4.14 kN/cm²; Makrolon 3.0–5.0 tons/in² is 4.1–6.9 kN/cm²1 US ton = 2 000 lbf; Covestro Makrolon 2558 datasheet (clamp tonnage 3.0–5.0 tons/in², 4.1–6.9 kN/cm²)
Machine size: 507.84 tons at an 80 % limit needs 634.8 tons; polycarbonate at 4 tons/in² needs 677.1 tons of clampAutodesk Moldflow (80 % of machine limit); SABIC Lexan guide 3–5 tons/in² (middle value 4)
A cold runner adds its own area: 8 × 21.16 + 20 in² = 189.28 in²; one cavity of 10 in² at 3 tons/in² needs 30 tonsRJG method: add the projected area of a cold runner (hand calculation)
A factor outside 2–10 tons/in² warns; zero area, fractional cavities and a utilisation of 20 % are rejectedBehaviour check: warnings and rejected inputs
Worked example of the article: the calculator reproduces 169.28 in², 507.8, 634.8, 4 518 kN to the digits printedThe worked example on this page, to the digits printed
Assumptions and sources
Assumptions and limits
Clamp force is the projected area of everything under melt pressure at the parting line (all cavities and a cold runner) times the clamp factor, which is the mean cavity pressure over that area; 1 US ton/in² equals 2 000 psi or 13.8 MPa.
Clamp factors depend on the resin, wall thickness and flow length: RJG gives 2 to 10 tons/in² with 3 as a starting point; the SABIC Lexan guide gives 3 to 5 tons/in² for polycarbonate and about 1 ton/in² more for glass-reinforced grades; resin datasheets give the value for a grade.
Projected area is the area seen along the direction of mould opening, with through-holes and cored-out areas taken away; side cores and hot runners are not included.
The machine should run below its rating: Autodesk Moldflow advises keeping the peak clamp force under about 80 % of the machine limit.
Too much clamp force can damage the mould: RJG reports a cavity block that failed when clamped at four times the required tonnage, so size to the need.
Sources
RJG Inc., Clamp Tonnage: More is Better, Right? (2017): projected area × cavities + cold runner × tonnage factor; 2–10 tons/in², 3 as a start; example 507.84 tons
SABIC (GE Plastics) LEXAN resin processing guide: 3 to 5 tons of clamp force per in² of projected area, about 1 ton/in² more for glass-reinforced grades; Covestro Makrolon 2558 datasheet 3.0–5.0 tons/in² (4.1–6.9 kN/cm²)
Autodesk Moldflow Insight help, Clamp force result: keep the maximum clamp force below approximately 80 % of the machine limit